Home > Categories > Operational Excellence & Lean > Lean Basics > Why do we want to be a Lean organisation? [FC]
CONTENT TYPE
Filter by content type
RECOMMENDED
Lean Basics
- 5S Roadmap
- Day in the life of (DILO) Study
- Jidoka
- Kaizen
- Lean Basics
-
- Help your operators create their own improvement toolkit [KI]
- Lean Overview [L]
- Standard Cost = Hidden Waste [KI]
- Struggling to improve? [KI]
- The 8 Types of Waste [FC]
- The 8 types of waste explained [KI]
- The 8 Wastes (Muda) [L]
- Toyota Production System [FC]
- What is Lean Manufacturing? [KI]
- Why do we want to be a Lean organisation? [FC]
- Line Balance Optimisation
-
- 5 Levels of Control – to achieve Perfect Flow [L]
- 5 Levels of Control [L]
- 5 Levels of Control Checklist [FC]
- Beacon Standard Example [FC]
- Block lines and Accumulation lines [KI]
- Cascade Control [KI]
- Line Balance Optimisation – Overview [L]
- Line Balance Optimisation [L]
- Line Control Theory [FC]
- Maximising Throughput [KI]
- Optimising Line Control [KI]
- Perfect Flow [KI]
- Line Crew Optimisation
- Planning Optimisation
- Problem Solving
- Process and Value Stream Mapping
- Six Sigma
- SMED & Changeover Optimisation
- SOPs & OPLs

Why do we want to be a Lean organisation? [FC]
Here are the typical benefits of a lean organisation.
(click on the image to expand)
Quiz-summary
0 of 1 questions completed
Questions:
- 1
Information
Take a quiz to find out how much you remember
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 1 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
-
Please note – the score from this Quiz is not recorded in your profile.
The Quiz varies for each of the topics (e.g. OEE & Six Loss; Data Gathering & Visualisation).
You can re-take the Quiz as many times as you like, or check your answers below.
- 1
- Answered
- Review
-
Question 1 of 1
1. Question
List the 8 Wastes (Muda)
- o T (ransport) o I (nventory) o M (otion) o P (eople) o W (aiting) o Over P (roduction) o Over P (rocessing) o D (efect)
Correct
Incorrect